Case Studies
Project: Mirage
Architect: Holder Mathias Architects PLC
Main Contractor: John Sisk & Son Ltd
Mirage Portishead marina development was born from the disused industrial docks that once thrived there. Being involved from the early stages, Taunton Fabrications were heavily involved in this re-generation project and were contracted to carry out both the secondary and primary architectural packages. The most prominent of these works being the supply of the terrace and balcony balustrades which look out over the modern marina.
The Works:
 |