We were extremely pleased to have been appointed as principal secondary and architectural metalwork sub-contractor on this major city centre development. The scheme comprises a 6,600m2 corporate office for the Environment Agency, 78 apartments in two central residential blocks and a 2,500m2 office block.
The contract ran over an 18 month duration and included the main feature atrium stair, 200metres of structural glazing, stainless steel and glass balcony balustrades, back of house circulation stair structures and roof terrace balustrade.