|
Please click on our various case studies to view some of our most recent projects and client details.
 |
Aardman Animations
Taunton Fabrications was awarded the complete metalwork package to include the structural, architectural and timber elements of the Aardman Animations project. >> |

 |
The Beacon Centre
Taunton Fabrications provided all of the secondary and architectural metalwork on the new Beacon Centre at Musgrove Park Hospital in Taunton. >> |

 |
Civil Justice Courts, Bristol
Taunton Fabrications are pleased to have completed all of the secondary and architectural metalwork on the new Civil Justice Courts in Bristol. >> |

 |
Elmfield Student Accommodation
The development of Elmfield's student accommodation was extremely awkward, with limited site access and space and so it was important to consider the design of all elements carefully. >> |

 |
Fry's Farm
After initial design proposals were submitted Taunton Fabrications was commisioned directly by the client to complete the design, manufacture, and installation. >> |

 |
Harbourside Bristol
Harbourside Bristol has seen a great deal of re-development over recent years, and is a regeneration project that Taunton Fabrications were proud to be associated with. >> |
 |
Honda Racing
Taunton Fabrications installed a complex helical staircase at Honda Racing, which incorporated the main floor landings and stainless steel balustrade. >> |

 |
O2 Slough
The O2 project, which includes a self supporting feature staircase, illustrates Taunton Fabrications architectural capabilities in the core areas of design engineering and total project management. >>
|

 |
Penninsula Medical School
Taunton Fabrications was pleased to have
completed work at the Penninsula Medical School, having completed all the secondary
and architectural metalwork. >>
|

 |
Princesshay
The scope of our contract at Princesshay included internal escape stair balustrades, spiral stairs, cat ladders, fire escapes, and architectural feature stairs. >>
|

 |
South Gloucester Offices
Taunton Fabrications have recently completed the installation of over 200 metres of atrium balustrade at the new South Gloucester Council offices. >> |

 |
Southgate Bath
Southgate Bath is the third city-centre development in the southwest with which Taunton Fabrications has been involved with main contractors Sir Robert McAlpine. >> |

 |
Swindon College
With additional focus being placed on aesthetic architectural design, Taunton Fabrications have become a leader in providing the education sector with a hassle free architectural design solution. >> |
|
|
|


Taunton Fabrications supplied and installed triple laminated glass floors throughout with a screen printed non slip surface, central lift shaft wall glass and glass balustrade both internally and externally. |

|
|