Case Studies
Project: O2 Slough
Architect: Nicholas Hare Architects
Main Contractor: Moss Construction
The O2 project illustrates Taunton Fabrications architectural capabilities in the core areas of design engineering and total project management. The feature staircase to the central atrium has no support from columns, and is supported only by the connections to the floor slab.
Structural glass balustrade was provided over two floor levels to match the feature stairs and galvanized fire escape stairs were also included within our package.
The Works:
 |