At Taunton Fabrications we continually look to investment in the latest 3D design software and training. Please click on our various case studies to view some of our most recent projects and client details.
 |
Apprentice Store
Taunton Fabrications where commissioned directly by the client to provide the architectural ribbon that linked the split levels of this 18th century industrial building. >> |

 |
The Beacon Centre
As well as carrying out structural steelwork, Taunton Fabrications were also responsible for a wide range of secondary steelwork that included; circulation stairs, cat ladders, open mesh walkways and railings. >> |

 |
Civil Justice Courts, Bristol
Taunton Fabrications are pleased to have completed all of the secondary and architectural metalwork on the new Civil Justice Courts in Bristol. >> |

 |
Harbourside Bristol, Building 5
The scope of our contract at Building 5 included both stainless steel and powder coated balustrades, as well as glass terrace balustrades, car park railings and roof access walkways. >> |

 |
Melksham Oak
The Melkham Oak School project included eighteen staircases, together with the associated stainless steel and glass balustrade. All work was pre-finished off site which meant that there was no on-site painting by the main contractor. >> |

 |
Princesshay
The scope of our contract at Princesshay included internal escape stair balustrades, spiral stairs, cat ladders fire escapes and architectural feature stairs. >> |

 |
South Gloucester Offices
Taunton Fabrications have recently completed the installation of over 200 metres of atrium balustrade at the new South Gloucester Council offices. >> |

 |
Southgate Bath
Southgate Bath is the third city-centre development in the southwest, with which Taunton Fabrications has been involved with main contractors Sir Robert McAlpine, and provided all of the secondary metalwork on this large project . >> |

 |
Archive
The project archive pages feature previous work completed by Taunton Fabrications. Please browse our archive and related image galleries to access all relevant information. >> |
|
|
Taunton Fabrications have recently completed the installation of over 200 metres of atrium balustrade at the new South Gloucester Council offices.